Bottlenecks in essential work and a growing pile of side work overlapped, making me look back on why the MVP was taking much longer than expected.

Bottlenecks in essential work and piling side work

The company projects are moving more slowly than I expected.

Bottlenecks are appearing in all kinds of essential tasks that seemed likely to be solved quickly. At the same time, I keep throwing in all kinds of side work from new ideas, so the growing workload feels increasingly impossible to handle.

Why I cannot stop at the essential flow

There are too many flaws to implement only the essential flow, so I keep adding moreโ€ฆ but for an MVP, it also feels like I have been building it for far too long.

If I had built it with the attitude that it only needed to run somehow, it would have been finished long agoโ€ฆ But I can plainly see potential issues scattered everywhere, and I cannot simply leave them alone.

Anyway, I need to find a way through this.