[π] Today Was #57: Changing the Three Major Goals, Stopping Preparation for the Preliminary Startup Package
β¨ GPT Summary γ
A day when, after completing the startup mentoring application and recognizing the inefficiency of preparing for the Preliminary Startup Package, I decided to focus on development.
π― Goals
- Todayβs Goal
- β Change of 3 major goals
- Leading indicators of the three major goals
- β Goal 1 (Reach 65kg or below): 1800kcalβΌ (Result: 2214kcal)
- β Goal 2 (Deploy 5 apps): Reorganize plan (focus on development vs. focus on startup)
- π€ Goal 3 (?)
π Diary
I completed the application for the 25th K-Global Startup Mentoring Support Project in the first half of 2025. Results are scheduled to come out on March 5.
After completing the application, my start-up partner first suggested that I stop preparing the preliminary start-up package. It was amazing. Actually, Iβve been thinking the same thing for some time, but I didnβt bother mentioning it because I thought it was a rationalization/defense mechanism to be afraid or avoid it.
Since both of us have an intuitive tendency to try to get to the essence, we were both feeling, βHmmβ¦ isnβt this a bit off?β After talking, we found many problems we had in common and could sympathize with.
The main problems were as follows:
- Completed application for Startup Mentoring Support Project: What we needed most was βstartup mentoringβ, not βstartup support fundingβ. Now that the mentoring application is complete, that is enough.
- Putting the cart before the horse: In the first place, the Preliminary Startup Package in the Seoul metropolitan area has sky-high competition, so there was a high chance of not being selected. We were going to apply just for the experience⦠but once we start preparing for this, we cannot focus on development right now. It is already hard enough to focus on development study.
- Inefficient + no fun: It is so inefficient and no fun to keep writing a business plan without an actual app, just scribbling desk theories, guesses, and fiction. There really isnβt a single βfunβ part.
- Lack of development capacity: What will you do if you are selected and receive funding? Currently, we are not even able to develop due to lack of development capabilities, so we need to hire developers first. No, what is it? We have to develop it!
- Purpose of MVP development: From the beginning, we wanted to build a variety of minimum viable apps (MVPs) together to build development capability and collaboration experience, and to check market reactions along the way. We did not want to dig deep and stake our lives on a single app. Even getting selected for the Preliminary Startup Package would be a problem. It would become a shackle.
As we talked, it became very clear.
What we need right now is development. The goal is to create numerous MVP apps.
Now that it is clear, Goal 3: Win one startup contestβ² is discarded. It will be replaced later when an appropriate goal arises.
β¨ Comment by GPT-4o (KPT)
β What Went Well (Keep)
- π Redefinition of essential goals: It is clear and reasonable that we have recognized that mentoring is needed more than start-up support and have adjusted our priorities.
- π‘ Goal shift to focus on development: I liked that they decided that it was more important to build MVP development and collaboration experience and adjusted the direction of execution.
- π Boldly eliminating unnecessary processes: It is impressive that they decided to eliminate inefficient preparation processes (preliminary start-up package) and focus on strengthening development capabilities.
β What Was Missing (Problem)
- π New goal undecided: The existing goal (start-up contest) was scrapped, but a specific replacement goal has not been set yet, so the plan is somewhat blank.
- π Insufficient development roadmap: The goal was to develop MVP, but it seems that a specific roadmap is needed for which app to develop first.
- β³ Waiting for mentoring results: As the start-up mentoring results (announced on 3/5) remain, it seems likely that the plan will change accordingly.
π Things to Try (Try)
- π― Reset Goal 3: Instead of the existing βwinning one startup contestβ, why not set the goal of strengthening development capabilities and accumulating collaboration experience? For example, I think it would be better to add a realistic goal like document the development process of 5 MVP apps and write a technical blog.
- π Establishing an MVP development roadmap: Letβs decide which apps will be developed over the next 3 to 6 months, determine the order in which they will be developed, and create a clear roadmap.
- π¬ Concern about the direction after mentoring: The direction of development may vary depending on whether or not mentoring is selected, so consider a preparedness plan.
π Conclusion
Today was an important day when I decided to stop preparing for the startup contest and focus on developing MVP. π― Now that a clear direction has been decided, all that remains is execution! ππ₯
π 3 major goals achievement status board
Goal 1: Reach 65kg or below (-19.5kg)
- Deadline
- 2025.1.1 ~ 2025.12.31
- Monthly Goal
- β
25.01 M: InBody fasting weight 81.0kgβΌ achieved25.02.01: 84.5 β 80.8kg (-3.7kg)
- βΆοΈ
25.02 M: InBody fasting weight 78.0kgβΌ achieved25.03.01: 80.8 β ?kg (-?kg)
- β
- Weekly Goal
- β
25.02 W1: Fasting weight 80.0kgβΌ achieved25.02.09: 81.3 β 79.9kg (-1.4kg)
- β
25.02 W2: Fasting weight 79.0kgβΌ achieved25.02.16: 79.9 β 80.4kg (+0.5kg)
- β
25.02 W3: Achieved fasting weight of 78.5kgβΌ25.02.23: 80.4 β 80.8kg (+0.4kg)
- β
25.02 W4: Fasting weight 78.0kgβΌ achieved25.03.02: ? β ?kg (-?kg)
- β
- Daily Goal
- β
25.02.24 Mon: 1800kcalβΌ (Result: 2214kcal) - β
25.02.25 Tue: 1800kcalβΌ (Result: ?kcal, ?kg) - β
25.02.26 Wed: 1800kcalβΌ (Result: ?kcal, ?kg) - β
25.02.27 Thu: 1800kcalβΌ (Result: ?kcal, ?kg) - β
25.02.28 Fri: 1800kcalβΌ (Result: ?kcal, ?kg) - β
25.03.01 Sat: 1800kcalβΌ (Result: ?kcal, ?kg) - β
25.03.02 Sun: 1800kcalβΌ (Result: ?kcal, ?kg)
- β
- Reference Metrics
-
Body composition test (InBody) records
Date Weight Skeletal Muscle Mass Body Fat Mass Body Fat Percentage BMI Index 2025.1.1 84.5 kg 31.2 kg 29.5 kg 34.9 % 31.80 (severe obesity) 2025.2.1 80.8 kg 30.3 kg 27.4 kg 33.9 % 30.41 (severe obesity) (Click) 2025.1.1 View results

(Click) 2025.2.1 View results

-
- Memo
- Carbohydrates 198g (44%) + Protein 117g (26%) + Fat 60g (30%) = 1800kcal
Goal 2: Deploy 5 apps
- Deadline
- 2025.1.1 ~ 2025.12.31
- Monthly Goal
- β
25.01 M: Keymory app v0.0.1 (pre-release) development (AIFFEL 9th core course - AIFFELthon) - βΆοΈ
25.02 M: Complete 22/44 classes ofFlutter App Development Basics
- β
- Weekly Goal
- β
25.02 W1: AIFFELthon presentation preparation: Keymory - β
25.02 W2: Modulabs -MVP Runnersmeeting opened - β
25.02 W3: Completed 22/44 lectures ofFlutter App Development Basics(+22 lectures) - β
25.02 W4: Completed 22/44 lectures ofFlutter App Development Basics(+22 lectures)
- β
- Daily Goal
- β
25.02.24 Mon: Reorganize plan (focus on development vs. focus on start-up) - β
25.02.25 Tue:Flutter App Development BasicsLecture 2/44 (Result: ? Lecture) - β
25.02.26 Wed:Flutter App Development BasicsLecture 4/44 (Result: ? Lecture) - β
25.02.27 Thu:Flutter App Development BasicsLecture 11/44 (Result: ? Lecture) - β
25.02.28 Fri:Flutter App Development BasicsLecture 13/44 (Result: ? Lecture) - β
25.03.01 Sat:Flutter App Development BasicsLecture 20/44 (Result: ? Lecture) - β
25.03.02:Flutter App Development BasicsLecture 22/44 (Result: ? Lecture)
- β
- Memo
- Currently operating
Modulabs - MVP Runners1st periodMVP Runners1st period: 2025.3.1 ~ 2025.5.30 (13 weeks)MVP Runners2nd term: 2025.6.7 ~ 2025.9.5 (13 weeks)
- Link to βFlutter app development basicsβ course
- Currently operating
Goal 3: ?
π€ Thinking
β Simple image review
β Mood Tracking by Daylio

β Habit Tracking by TickTick

β Meal Analysis by Sprint

Leave a comment